• CAREERS
Tel UK: 0121 6303472 | IRL: 042 9693500
O'REILLY PRECAST
  • Home
  • Products
    • Walls
      • Precast Walls
      • Architectural Wall Panels
      • Prestressed Wall Panels
      • Insulated Wall Panels
      • A-Walls
      • L-Walls
    • Floors, Stairs, Columns & Beams
      • Hollowcore Flooring
      • Wideslab and Plate Flooring
      • Thermal Flooring
      • Precast Concrete Stairs
      • Precast Columns and Beams
      • Precast Concrete Frames
    • Agricultural
      • Agricultural Solutions
      • Cattle Slats
      • Cattle Feeding Drinking Troughs
      • Cubicle Beds
      • A-Walls
      • L-Walls
      • Pre-stressed Wall Panels
    • Readymix, Blocks & Stone
      • Ready Mix Concrete
      • Aggregates and Sand
      • Blocks
      • Trinity Airtight Blocks
      • Fairfaced Block
      • Ecolite Block
      • Oakstown Tanks
  • Projects
    • UK
      • Media City Manchester
      • Hilton Inn Heathrow T2
      • Hacton Primary School
      • Mosaic Place, Purley, London
      • Apex House, Tottenham, London
    • Ireland
      • Deansgrange Residential Development
      • Charleston Townhouses Dublin
      • Capital Dock Dublin
      • One Stemple Exchange Dublin
      • Bak Bulk Low Carbon Prestressed
    • Europe
      • Iron Mountain Data Centre
  • Sectors
  • About
    • About Us
    • Careers
    • Management Team
    • Quality
    • Design Process
    • Environment
    • Health & Safety
  • News
  • Contact
  • Menu Menu
  • Link to LinkedIn
  • Link to Facebook
  • Link to X

The Newly Introduced Concrete Products Levy

News

In a recent development, Minister for Finance Michael McGrath has announced a significant amendment to the Defective Concrete Products Levy, which has garnered much attention since its introduction as part of Budget 2023. This amendment is set to have a positive impact on the precast concrete industry, and O’Reilly Concrete is pleased to share this important news with our customers.

Concrete Products Levy Background

The Defective Concrete Products Levy was initially introduced in October 2022, as part of a broader initiative to fund the Mica Redress Scheme. It marked a historic move to secure contributions from the construction sector toward rectifying issues related to defective concrete products. The levy came into effect on September 1st, 2023, raising questions and concerns within the industry.

Initially, a range of precast concrete products were included in the levy’s scope. However, following careful consideration and consultations with industry experts, Minister McGrath has taken proactive steps to address these concerns and maintain a balanced approach.

Exclusion of Precast Concrete Pouring

In a welcome move for the precast concrete industry, Minister McGrath has confirmed that pouring concrete used for precast products will be excluded from the Defective Concrete Products Levy. This exclusion aligns with industry feedback and recognises the potential negative impact the levy could have had on the export of precast products and competition within the jurisdiction.

The amendment to the levy will officially take effect on January 1st, 2024. In the meantime, a refund scheme will be in place for the interim period until the end of 2023. This change means that concrete blocks and pouring concrete for uses other than in precast products will remain within the scope of the levy.

Minister McGrath expressed his belief that this amendment strikes a balance between funding the Mica Redress Scheme and minimizing the impact on inflation in the construction sector. The Department of Finance, in collaboration with Revenue, will closely monitor the introduction and operation of the levy and will continue to engage with industry stakeholders to address any issues that may arise.

Important Dates

The first filing date for returns related to the Defective Concrete Products Levy is January 23rd, 2024. This date should be noted by all relevant parties to ensure compliance with the new regulations.

Conclusion

O’Reilly Concrete welcomes the decision to exclude pouring concrete used for precast products from the Defective Concrete Products Levy. This amendment demonstrates the government’s willingness to listen to industry concerns and take necessary action to ensure the continued growth and success of the precast concrete sector.

We are committed to keeping our customers and partners informed about important developments in our industry. If you have any questions or require further information about how this amendment affects your business, please do not hesitate to contact us. Together, we can navigate these changes and build a stronger, more sustainable future for the construction sector in Ireland.

For further reading see – https://www.irishtimes.com/business/economy/2023/09/06/minister-agrees-to-limit-scope-of-defective-concrete-products-levy/

 

Share this entry
  • Share on Facebook
  • Share on X
  • Share on Pinterest
  • Share on LinkedIn
  • Share by Mail
https://oreillyprecast.com/wp-content/uploads/2024/01/Concrete-Levy-Graphic.jpg 600 900 PG https://oreillyprecast.com/wp-content/uploads/2023/12/oreilly-precast-logo.png PG2023-09-08 12:48:182024-01-03 13:04:49The Newly Introduced Concrete Products Levy

News & Resources

  • THE MODEL FITS. WILL THE BUILDING? -
  • Hidden costs in a precast project illustrated on a multi-storey construction site
    What the Tender price doesn’t tell you. -
  • MMC Ireland National Conference 2026 – Darragh O’Reilly, O’Reilly Precast
    MMC Ireland National Conference 2026: Powerful Industry Panel Featuring O’Reilly Precast -
  • How Standardised Design Can Unlock Faster, Better Housing -
  • O’Reilly Group Retains ISO 9001 and ISO 45001 Certifications for Quality and Safety -
  • The O’Reilly Group Kicks Off Movember 2024 at Croke Park -
  • 2024 Trade Shows -
  • The O’Reilly Games 2024 -
  • Sustainable Solutions: Environmental Benefits of Precast Construction -
  • UKCW 2023
    Join O’Reilly Precast at UK Construction Week -
  • The Newly Introduced Concrete Products Levy -
  • Graphic for Mastering Modern Construction with Precast
    Mastering Modern Construction with Precast Concrete -
  • O’Reilly Precast at Offsite Expo September 2023 Coventry -
  • O’Reilly Precast at Offsite Expo – September 2023 Coventry -
  • Building a Sustainable Future Report Cover
    Building a Sustainable Future – Roadmap to Net Zero by 2050! -
  • Offsite Expo May 2023
    Offsite Expo May 2023 London -
  • image of various sectors for O'Reilly Precast leaders in constructionO'Reilly Precast
    Leaders in Construction for over 80 years -
  • Can using Precast Save Money
    How Can using Precast Save Money Compared to Traditional Construction? -
  • team addressing a common problem with precast
    One Common Problem with Precast and How we Overcame it -
  • Academy of Music new campus opens with O’Reilly Concrete’s help -

O’Reilly Precast is a member of the O’Reilly Group of companies.

Accreditation Logos for O'Reilly Precast
Search Search

Larchfield, Kingscourt,
Co. Cavan,
A82 HY00, Ireland
Phone: +353 (0) 42 969 3500
Email: sales@oreillyprecast.com
Web: www.oreillyprecast.com

Precast Concrete Frames, Walls, Columns & Beams, Stairs, Superstructure and Façade Construction.

(For all enquiries use our Birmingham Number)

Birmingham Office
Izabella House, 24-26 Regent Place, City Centre, Birmingham, B1 3NJ
Tel 0121 630 3472
sales@oreillyprecast.com
www.oreillyprecast.com

Production Facility Wales
Atlantic Way, Barry Port, Barry,
Wales, CF63 3RG, UK
Tel 01446 789210

© Copyright 2026 - O'Reilly Precast :: by The Web Crew
  • Link to LinkedIn
  • Link to Facebook
  • Link to X
  • Home
  • Products
  • Projects
  • Sectors
  • About
  • Contact
  • Privacy Policy
Link to: Mastering Modern Construction with Precast Concrete Link to: Mastering Modern Construction with Precast Concrete Mastering Modern Construction with Precast ConcreteGraphic for Mastering Modern Construction with Precast Link to: Join O’Reilly Precast at UK Construction Week Link to: Join O’Reilly Precast at UK Construction Week UKCW 2023Join O’Reilly Precast at UK Construction Week
Scroll to top Scroll to top Scroll to top