Full Precast Frame for Data Centre
In 2020 O’Reilly Concrete designed the full precast frame for data centre, Iron Mountain in Frankfurt, Germany. It was a pleasure to design, manufacture and install the full precast frame for this development for Collen Construction.
Iron Mountain Data Centre, Frankfurt is a purpose-built data centre with 27 MW of power capacity in a 36,040 M2 facility. The campus is located near central Frankfurt in Germany and offers a hybrid IT environment, a centre for data change and a centre for consolidating.
Construction of this hyperscale data centre project began in April 2020 and was completed within a 26-week period.
Full Precast Frame for Data Centre – products used
Precast Flooring: 28,575 m²
Precast Walls: 11,885 m²
Precast Columns: 690
Precast Beams: 790
Delta Beams: 30
Precast Stairs: 34 Flights