Full Precast Frame for Data Centre

Full Precast Frame for Data Centre in Germany

In 2020 O’Reilly Concrete designed the full precast frame for data centre, Iron Mountain in Frankfurt, Germany. It was a pleasure to design, manufacture and install the full precast frame for this development for Collen Construction.

Iron Mountain Data Centre, Frankfurt is a purpose-built data centre with 27 MW of power capacity in a 36,040 M2 facility. The campus is located near central Frankfurt in Germany and offers a hybrid IT environment, a centre for data change and a centre for consolidating.

Construction of this hyperscale data centre project began in April 2020 and was completed within a 26-week period.

Tekla BIM Full Precast Frame for Data Centre

Full Precast Frame for Data Centre – products used

Precast Flooring: 28,575 m²
Precast Walls: 11,885 m²
Precast Columns: 690
Precast Beams: 790
Delta Beams: 30
Precast Stairs: 34 Flights